Skip to content
4,102 playing now
Timberborn cover

Timberborn

by Mechanistry

  • Released Sep 15, 2021
  • $34.99
  • 23 h to beat
  • Mac
  • PC (Microsoft Windows)

96%positive reviews

40,631 positive1,709 negative

What players say

Pros

  • Adorable beavers and calm zen gameplay

  • Stable and good performance

Cons

  • Removed features fundamentally change the game

  • Barely playable after an update

Mixed

  • Some call it a nice zen game, others say the design shift alienated players

System requirements

Minimum:

Requires a 64-bit processor and operating system

OS: Windows 10 or newer

Processor: 4-core 1.7 GHz or better

Memory: 8 GB RAM

Graphics: GeForce GTX 950, Radeon R9 380 or similar

DirectX: Version 11

Storage: 3 GB available space

View on Steam

Humans are long gone. In a world struck by droughts and toxic waste, will your lumberpunk beavers do any better? Timberborn is a sandbox city-building game featuring ingenious animals, vertical architecture, water physics, and terraforming. Contains high amounts of wood.

Mankind turned Earth into a…